If for an existing well, would do an intervention in the future, will this be added in the production profile section, or should this be set up using a facility constraint?
-
Can PE information be copied from one Asset to the other?
-
How do I connect historic data to it’s forecast production potentials?
-
How can we remove constraints in our reservoir simulation without affecting pressure volume too much?
-
We have X fields, and if there is a pitstop/revision stop, all the fields would be affected. So, for the PE, should we add the shutdowns individually, or is there a way to make a template and add them like a cluster or group?
-
When we defined the historical wells and production wells, the naming was not completely consistent, so we did not get automatic connections established through the wellbore name. Is there an easy way to change the wellbore names?
-
How do I connect the fields with the different facilities?
-
Can I define a decline curve instead of adding the real production profile?
-
Can I define a decline curve based on my historical inputs?
-
When importing “Production Potentials”, what does the name “Profile name” (in column A) in the Excel template for “Production Potentials” on the Monthly sheet refer to?